TOKYO (AP) — The operator of the wrecked Fukushima nuclear power plant said Monday that it has safely completed the first release of treated radioactive water from the plant into the sea and will inspect and clean the facility before starting the second round in a few weeks.

The Fukushima Daiichi plant began discharging the treated and diluted wastewater into the Pacific Ocean on Aug. 24. The water has accumulated since the plant was damaged by a massive earthquake and tsunami in 2011, and the start of its release is a milestone in the plant’s decommissioning.

The discharge, which is expected to continue for decades until the decommissioning is finished, has been strongly opposed by fishing groups and by neighboring countries. China has banned all imports of Japanese seafood in response, hurting producers and exporters and prompting the Japanese government to compile an emergency relief fund.

Prime Minister Fumio Kishida, at summits last week of Southeast Asian countries and the Group of 20 nations, stressed the safety and transparency of the release to win international support and sought the immediate lifting of China’s ban.

Other news US given OK to enforce maritime law around Palau as Washington vies with China for Pacific influence Events at Fukushima Daiichi nuclear plant since the 2011 earthquake, tsunami and nuclear disaster Scott Dixon didn’t expect much as a young New Zealand racer. The Iceman is now IndyCar’s Ironman

During the 17-day first release, the plant’s operator, Tokyo Electric Power Company Holdings, said it discharged 7,800 tons of treated water from 10 tanks. About 1.34 million tons of radioactive wastewater is stored in about 1,000 tanks at the plant.

Plant workers will rinse the pipeline and other equipment and inspect the system over the next few weeks before starting the release of the second round of 7,800 tons stored in 10 other tanks, TEPCO spokesperson Teruaki Kobashi told reporters Monday.

All sampling data from seawater and fish since the start of the release have been way below set safety limits, officials said.

TEPCO and the government say the wastewater is treated to reduce radioactive materials to safe levels, and then is diluted with seawater to make it much safer than international standards.

The radioactive wastewater has accumulated since three of the plant’s reactors were damaged by the 2011 earthquake and tsunami. It continues to grow because cooling water used on the damaged reactors leaks into the reactor basements, where it mixes with groundwater.

TEPCO plans to release 31,200 tons of treated water through March 2024, and officials say the pace will pick up later.

The government and TEPCO say the discharge is unavoidable because the tanks will reach their capacity of 1.37 million tons next year and space at the plant is needed for its decommissioning.

Disclaimer: The copyright of this article belongs to the original author. Reposting this article is solely for the purpose of information dissemination and does not constitute any investment advice. If there is any infringement, please contact us immediately. We will make corrections or deletions as necessary. Thank you.